Whitechurch Housing Development
Client : DBW Construction Ltd
Construction Value: €35M
MHL were responsible for all engineering design and engineering supervision on this Housing project designed by RORSA Architects and built by Bowen Construction. Phase 1 of this development was completed in 2008 with phases 2&3 currently on hold.
MHL were also responsible for the Sanitary Engineering. This contract provided Whitechurch Village with a 3000 P.E. Sewage Treatment Plant and a 900cub.m. Water Supply. The treated effluent was pumped 6.5km to Cork City’s Main Drainage System and the project was completed in 2008.